Building

The building approval, the fitness certificate, contractor liability, taxes on a build.

PBG: the building approval in Bali and whose name it is in

A PBG is issued to the building owner before construction. It cannot be moved to another name. Anyone can request a copy from the regency.

Last verified 15 August 2026

SLF: the certificate of fitness for a building in Bali

The SLF certifies that a finished building is fit for use. It rests on the supervisor's fitness statement and as-built drawings. Issue is free.

Last verified 15 August 2026

Who signs the drawings and engineering for a PBG and an SLF

A certified planner prepares the technical plan for the PBG. The supervising consultant issues the fitness statement for the SLF.

Last verified 15 August 2026

How long is a contractor liable for building failure in Indonesia?

A contractor answers for building failure for the planned life of the structure, capped at 10 years from final handover under UU 2/2017.

Last verified 11 September 2026

Taxes and statutory charges on building a villa in Bali

A VAT-registered contractor charges 11% PPN. A self-build of 200 m2 or more pays 2.2% on build costs. PPh final, BPJS and the PBG fee also apply.

Last verified 5 September 2026

What a build costs per m2 in Bali, and how to compare quotes

A per m2 figure means nothing until you know the area it divides by, the scope inside it and the tax on top. How to compare build quotes.

Last verified 5 September 2026

Design and consultant fees on a build in Bali

Indonesian law says who must design and supervise, and taxes the fee at 3.5% or 6%. The architects' fee guide shows 8.00% up to Rp 200 million.

Last verified 15 August 2026

Environmental approval and groundwater permits for a build in Bali

Every project needs an AMDAL, a UKL-UPL or an SPPL under PP 22/2021. A borewell for business use needs a groundwater licence first.

Last verified 21 November 2026

What a construction contract must contain under Indonesian law

UU 2/2017 Article 47 lists 16 items every construction contract must cover. The contract is in Indonesian, plus English with a foreign party.

Last verified 16 September 2026

Insurance during and after a build in Indonesia

The contract must cover worker social security and risk guarantees. Project cover with BPJS Ketenagakerjaan is charged on contract value.

Last verified 21 November 2026

General information, not legal, tax or investment advice. Your position depends on your circumstances, so take your own case to a property lawyer before you sign or pay.