How long is a contractor liable for building failure in Indonesia?

Shanny Poijes · Developer in Indonesia (director, PT Core Group Indonesia) · Background in project management and advisory
Last verified 11 September 2026

The Construction Services Law makes the service provider liable for building failure (kegagalan bangunan). The period follows the planned life of the structure.

Where that planned life is longer than 10 years, the provider is liable for at most 10 years. The clock starts on the date of final handover of the construction service.

After that period the liability passes to the service user, meaning the party that ordered the work.

What the law says

UU 2/2017, Article 65(1)

This is Law 2 of 2017 on Construction Services. The service provider is liable for building failure for the period set by the planned life of the structure.

UU 2/2017, Article 65(2)

Where the planned life exceeds 10 years, the provider is liable for at most 10 years. The period counts from the date of final handover of the construction service.

UU 2/2017, Article 65(3)

The service user is liable for building failure that occurs after that period.

PP 22/2020, Article 86

The implementing regulation, amended in other parts by PP 14/2021, restates the outer limit of 10 years from final handover.

What it means

The 10 years is a ceiling. A structure designed for a shorter planned life carries a shorter liability period.

The date of final handover matters. Record it in a signed handover document, because the period is counted from that date.

The law speaks of the service provider and the service user. A buyer who was not a party to the construction contract should ask a lawyer how his own claim reaches the contractor.

Civil Code Article 1317 allows a stipulation for a third party. It cannot be withdrawn once the third party declares it will use it. Whether it gives a later owner a direct claim in a given contract is a question for a lawyer.

Article 65 concerns building failure. A defects or maintenance period for finishes, fittings and equipment is a contract term, and its length is whatever the contract says.

A contract may promise more than the statute. Whether a contract can shorten the statutory period is a question for a lawyer.

What to check

  • Ask for the construction contract and read its building-failure and defects clauses.
  • Find the planned life of the structure in the design documents.
  • Ask for the signed final handover record and note its date.
  • Check who the service provider is: the legal name of the contractor that signed.
  • Ask a lawyer how a buyer or later owner can enforce the contractor's liability.
  • Keep the as-built drawings and structural calculations for the full liability period.

Downloads

Quality control checklist (PDF)

Questions

Is there a 10 year structural warranty by law in Indonesia?

UU 2/2017 Article 65 makes the provider liable for building failure for the planned life of the structure. The cap is 10 years from final handover.

When does the 10 years start?

On the date of final handover of the construction service.

Who is liable after the period ends?

Article 65(3) places liability for later building failure on the service user.

Sources
  • Law (UU) 2 of 2017 on Construction Services, State Gazette 2017 No. 11, official text on peraturan.go.id and the Ministry of Public Works legal database
  • Government Regulation (PP) 22 of 2020, as amended by PP 14 of 2021, implementing the Construction Services Law

General information, not legal, tax or investment advice. Your position depends on your circumstances, so take your own case to a property lawyer before you sign or pay.

Read nextThe library

What a construction contract must contain under Indonesian law

UU 2/2017 Article 47 lists 16 items every construction contract must cover. The contract is in Indonesian, plus English with a foreign party.

Insurance during and after a build in Indonesia

The contract must cover worker social security and risk guarantees. Project cover with BPJS Ketenagakerjaan is charged on contract value.

Who signs the drawings and engineering for a PBG and an SLF

A certified planner prepares the technical plan for the PBG. The supervising consultant issues the fitness statement for the SLF.