What a build costs per m2 in Bali, and how to compare quotes
There is no single build cost per m2 in Bali. Two quotes for the same drawings can differ widely and both be honest. The gap is usually scope, area basis and tax, before it is price.
A per m2 figure is a total divided by an area. You need to know what is inside the total and which area was used. Then you can compare.
This page gives no price range. Published per m2 figures for Bali are mostly marketing. Price your own drawings and specification, and compare the quotes line by line.
What the law says
PMK 131/2024, Article 3
The statutory PPN rate is 12% from 1 January 2025. For non-luxury goods and services the tax base is 11/12 of the price, which gives an effective 11%. This Minister of Finance regulation applies to a PKP contractor's invoice.
Final income tax on construction work is 1.75% for a provider with a small-qualification business certificate or a certified individual. It is 4% for a provider with no certificate and 2.65% for all others. Construction consultancy is 3.5% with a certificate and 6% without.
PMK 81/2024, Article 324(3)
The base is all costs incurred or paid to build, in each tax month until completion. The only exclusion is the cost of acquiring the land.
PMK 11/2025, Article 20, as amended by PMK 53/2025
The self-build rate is 2.2%, being 20% x 11/12 x 12%. Under the transition rules of PMK 81/2024, the rate in force on the deposit date applies.
What it means
Check the tax basis first. A contractor registered for VAT adds an effective 11% to the invoice. A quote that includes VAT and one that excludes it are not comparable until you put them on the same basis.
If no VAT-registered contractor invoices the work, the self-build rule can apply instead. The rate is 2.2% of all build costs except land, and the owner pays it. Put that in the budget.
The contractor's own final income tax sits inside its price. It is not an extra line for you, but it explains part of the difference between a certified and an uncertified builder.
Check the area. One quote divides by the enclosed floor area. Another divides by everything built, with terraces, pool deck and roofed outdoor space. The same total gives two very different per m2 figures.
Check the scope. Common gaps are site set-up and supervision costs, the pool, air conditioning, kitchen and joinery, sanitary ware supplied by the owner, external works, and utility connections.
Check the date. A quote is a price on its own date. Bring an older figure forward with the official construction price index, and label the result as derived.
In practice
Practitioners report that scope differences explain most of the spread between quotes for the same house. A low figure often leaves out site costs, the pool or the air conditioning.
Practitioners report that a bill of quantities with no section for site set-up and running costs makes bids hard to compare. Ask every bidder to price that section, or to write nil against each line.
Practitioners report that the contractor's overhead and profit is shown as a separate percentage by some bidders and buried in the rates by others. Ask each bidder to state which.
What to check
- Ask every bidder to price the same bill of quantities from the same drawings.
- Ask each bidder to state in writing whether the total includes VAT.
- Ask which area the per m2 figure divides by, and measure it yourself from the drawings.
- Ask for a priced line, or nil, against site set-up, supervision, insurance and temporary works.
- List what the owner supplies, and add its cost back before you compare.
- Compare rates line by line, and ask about any rate far above or below the others.
- Add the taxes, the permit fee and the utility connections as separate lines in your budget.
What is the build cost per m2 for a villa in Bali?
There is no single figure. It depends on the specification, the area used to divide, the scope inside the quote and the tax basis. Price your own drawings with several bidders.
Why are two quotes for the same villa so far apart?
Usually because they do not cover the same work. Check the tax basis, the area and the list of what is left out before you compare the totals.
Does a build quote include VAT?
Only if it says so. A VAT-registered contractor adds an effective 11%. Ask each bidder to state the basis in writing.
Is there tax if I build without a VAT-registered contractor?
The self-build rule can apply to a building of 200 m2 or more. The rate is 2.2% of all build costs except land.
- Government Regulation (PP) 9 of 2022 on income tax on construction services
- Minister of Finance Regulation (PMK) 81 of 2024, Articles 323 to 331, official text on the BPK regulations database
- Minister of Finance Regulation (PMK) 131 of 2024 on the VAT base
- Minister of Finance Regulation (PMK) 11 of 2025, as amended by PMK 53 of 2025
General information, not legal, tax or investment advice. Your position depends on your circumstances, so take your own case to a property lawyer before you sign or pay.