Two different parties sign at two different moments. A certified planning provider prepares the technical plan that goes in for the PBG (the building approval) before construction.

At completion, the supervision or construction management consultant issues the statement that the building is fit for use. That statement, with as-built drawings, supports the SLF (the certificate of fitness).

One exemption exists. A small single house may be drawn by its owner under the basic earthquake-resistant rules or a prototype design.

What the law says

PP 16/2021, Article 252(1)

Government Regulation 16 of 2021 implements the Building Law. Technical planning is done by a certified planning provider.

PP 16/2021, Article 187

The technical plan covers architecture, structure, utilities and specifications. The structural part includes a calculation, with a soil investigation for buildings over 2 storeys under Article 187(4).

PP 16/2021, Articles 254 to 256

An expert review panel (TPA) reviews the plan, architecture first and then structure and utilities. The review is capped at 5 sessions or 28 working days. It ends in a statement that the technical standards are met, and then the PBG.

PP 16/2021, Articles 252(4) and 254(3)

The exemption covers a single house of up to 72 m2 on 1 storey, or up to 90 m2 on 2 storeys. Its owner may prepare the drawings using the basic earthquake-resistant rules or a prototype. A technical review team (TPT) reviews it.

PP 16/2021, Articles 59 and 265

The supervision consultant approves preparation documents before work starts and notifies the regency at the start and end of each stage. The regency inspects at substructure, basement, superstructure with architecture and utilities, and testing. If no inspector comes within 3 working days the contractor may proceed.

PP 16/2021, Articles 60(6), 272(4), (6) and (11)

The supervision or construction management consultant issues the fitness statement from its checklist before final handover. It is uploaded with as-built drawings.

PP 16/2021, Articles 60(7) and 273

Where more than one supervisor worked on the building, a technical assessor (Pengkaji Teknis) issues the statement. A cluster with the same design needs one statement for each building.

PP 16/2021, Articles 29, 210(b) and 212

Structure must be strong, stable and serviceable, with seismic design for the site's earthquake risk, by engineering calculation. For an existing building without a PBG, a certified technical assessor carries out the fitness check.

What it means

Appoint the certified planner before design is fixed. The PBG file needs architecture, structure, utilities and specifications from a provider the regulation calls certified.

Budget a soil investigation for any building over 2 storeys. Article 187(4) puts it inside the structural calculation.

Appoint the supervisor before work starts. Article 59 has it approve the preparation documents first. The same party issues the fitness statement at the end.

Where more than one supervisor works on the building, the statement moves to a technical assessor under Article 60(7).

Commissioning of the mechanical and electrical systems is recorded in minutes signed by the supervisor and the authority, under Article 270.

The owner-drawn exemption is narrow. It covers a single house within the 72 m2 or 90 m2 limits and nothing larger.

PP 16/2021 names no SNI standard numbers for structure. It also says only that the planner is certified. The rule on which discipline signs which sheet sits in a ministerial regulation, so ask the permit consultant for the current upload requirements.

In practice

Practitioners report. This is what the market and the desks do, which is not the same as the written law.

Practitioners report that drawings and calculations uploaded to SIMBG, the national permit system, carry expert signatures. Each expert holds an SKK competence certificate for the discipline.

Practitioners and academic sources consistently name the same structural standards. They are SNI 1726:2019 for seismic design, SNI 1727:2020 for loads, SNI 2847:2019 for concrete and SNI 8460:2017 for geotechnical design.

What to check

  • Ask the architect and each engineer for their current certification before you sign their appointment.
  • Confirm that the structural calculation includes a soil investigation if the building exceeds 2 storeys.
  • Name the supervision consultant in writing before construction starts.
  • Ask the supervisor for its checklist and for the stage notifications it sent to the regency.
  • Keep the commissioning minutes for the mechanical and electrical systems.
  • Require as-built drawings from the contractor as a condition of final payment.
  • Ask for one fitness statement for each building in a cluster.
Questions

Who signs the drawings for a PBG?

A certified planning provider prepares the technical plan under PP 16/2021 Article 252(1). Practitioners report that each discipline's sheets are signed by a certified expert in that discipline.

Who signs off the building for the SLF?

The supervision or construction management consultant issues the statement of fitness for use. Where there was more than one supervisor, a technical assessor issues it.

Can I draw my own house for a PBG?

Only a single house of up to 72 m2 on 1 storey or up to 90 m2 on 2 storeys. Larger buildings and business buildings need a certified planner.

Is a soil test required for a villa?

Article 187(4) requires a soil investigation within the structural calculation for buildings over 2 storeys. For lower buildings, ask the structural engineer what the site needs.

Sources
  • Government Regulation (PP) 16 of 2021, implementing the Building Law (UU 28/2002), official text on the BPK regulations database

General information, not legal, tax or investment advice. Your position depends on your circumstances, so take your own case to a property lawyer before you sign or pay.

Read nextThe library

PBG: the building approval in Bali and whose name it is in

A PBG is issued to the building owner before construction. It cannot be moved to another name. Anyone can request a copy from the regency.

SLF: the certificate of fitness for a building in Bali

The SLF certifies that a finished building is fit for use. It rests on the supervisor's fitness statement and as-built drawings. Issue is free.

Design and consultant fees on a build in Bali

Indonesian law says who must design and supervise, and taxes the fee at 3.5% or 6%. The architects' fee guide shows 8.00% up to Rp 200 million.

How long is a contractor liable for building failure in Indonesia?

A contractor answers for building failure for the planned life of the structure, capped at 10 years from final handover under UU 2/2017.