← Land use and zoningShanny Advisory · The library

How to check the zoning of a plot in Badung, Bali

Shanny Poijes · Developer in Indonesia (director, PT Core Group Indonesia) · Background in project management and advisory
Last verified 19 September 2026 · checked for changes 21 November 2026

Badung regency runs a public zoning information service. It is operated by the regency's public works and spatial planning office. It needs no login.

For a parcel it returns the zone, any overlays, the building ratios, the setbacks and the height limit. It also returns a table of permitted activities. It covers all six districts of Badung.

The result is the regency's official system position on the day you query it. It is strong evidence for due diligence. It is not a permit.

The legal texts behind it are the district detailed plans and the regency spatial plan, Perda Badung 4/2025. For a project, the issued KKPR (the spatial approval) is the document that counts.

What the law says

Perbup Badung 59/2021, 8/2021, 9/2021, 34/2022, 6/2023 and 28/2023

These are the detailed spatial plans for Kuta Selatan, Kuta, Kuta Utara, Mengwi, Abiansemal and Petang. They hold the zone codes, building ratios and activity tables the service returns.

Perda Badung 4/2025, Article 96

In the regency's tourism area, coverage is capped at 50% and the floor area ratio at 2.0. The green share is at least 15%. Limited-intensity housing is conditional and intensive housing is not allowed.

Perbup Badung 34/2022, Article 42(6)

In Mengwi, sub-zone R-4 is capped at 9 m. Annex VII sets 15 m for zones W, R-2 and R-3.

Perda Bali 2/2023, Article 100(2)

Arahan ketinggian bangunan secara umum di Wilayah Provinsi dibatasi maksimum 15 m (lima belas meter) diatas permukaan tanah tempat bangunan didirikan.

The provincial height cap of 15 m sits above every Badung zone.

Perda Bali 4/2026, Article 13(2)

Productive land designated in the spatial plans may not be converted. The farmland overlay in a Badung result is what engages this rule.

What it means

The zone comes with a code, a name and a definition. Tourism is W, trade and services K-1 to K-3, and mixed use C-2. Housing is R-2 to R-4 and farmland P-1 to P-3.

Overlays appear only when present. The one to look for first is LP2B, the protected farmland flag. Others include the airport safety area, disaster risk, cultural heritage and water catchment.

The building ratios are KDB (maximum coverage), KLB (floor area ratio) and KDH (minimum green share). Zones W, K-1 and K-2 in Mengwi and Kuta Selatan show 50%, 2.0 and 15%.

The activity table uses four letters: I for allowed and X for not allowed. T is limited by hours, intensity or number. B is conditional, for example on an environmental document.

The activity called villa in the table is tourist accommodation. It is marked X in every residential zone from R-2 to R-4. A house is allowed there, so residential zoning supports a home.

Villa and pondok wisata (small guest accommodation) are plainly allowed in zones W, K-1, K-2 and C-2. Star hotels are allowed only in W, K-1 and K-2, plus K-3 in Kuta Selatan.

In horticulture and plantation zones a villa is limited and conditional. A food-crop parcel under LP2B was sampled on 19 September 2026. It allowed 10% coverage and no villa, hotel or house.

Building rules in the result include road setbacks and temple clearance. One sampled zone showed 5 m from the temple wall. The T and B conditions are spelled out only in the regulation text.

What to check

  • Query the parcel on the regency's public zoning service and save the result with its date.
  • Read the zone code and name, then look for an LP2B overlay.
  • Find your exact activity in the table and note the letter beside it.
  • Note the coverage ratio, floor area ratio, green share, setbacks and height limit.
  • Read the conditions behind any T or B mark in the district regulation.
  • Compare the result with the seller's KKPR, which may reflect an older plan.
  • Repeat the query before you sign, because the data can change.
Questions

Is the Badung zoning result a permit?

No. It shows the regency's zoning position for the parcel on that date. Permits follow through the KKPR and the building approval.

Can I check zoning online for plots outside Badung?

No equivalent public service has been found for the other Bali regencies. Ask the regency's spatial planning office for a written zoning statement.

What does X mean in the activity table?

X means the activity is not allowed in that zone. I is allowed, T is limited and B is conditional.

Can a villa operate in a Badung residential zone?

As tourist accommodation, no. The tables mark the villa activity as not allowed in zones R-2 to R-4. A house is allowed there, and pondok wisata is limited and conditional.

Sources

General information, not legal, tax or investment advice. Your position depends on your circumstances, so take your own case to a property lawyer before you sign or pay.

Read nextThe library

How zoning works in Bali

Bali zoning is a stack of plans. The zone code sets the permitted use. Coastal, cliff, temple and farmland overlays decide what you can build.

Rice fields and protected farmland in Bali: LSD, LP2B and release letters

A rice field in Bali can carry three separate locks: the LSD map, LP2B status and the zone. A ministry release letter touches only the first.

KKPR: the spatial approval that comes before a build in Indonesia

KKPR confirms that a planned activity fits the spatial plan at that location. It comes before the building approval, and it gates an HGB grant.

Checking a land title in Bali before you pay

A certificate check is the start. Also check who must sign, spousal consent, powers of attorney, the lease note, village land and the boundaries.